- The Chemical Engineering department is equipped with fully furnished laboratories, class rooms, Seminar Hall details of which as follows
|
Sr. No. |
Name of facility |
Number |
Area available (Sq. m) |
|
1 |
Class Room |
03 |
236 Sq. m |
|
2 |
Mechanical Operation |
01 |
105 Sq. m |
|
3 |
Mass Transfer-I |
01 |
105 Sq. m |
|
4. |
Mass Transfer-II |
01 |
105 Sq. m |
|
5. |
Chemical Reaction Engineering |
01 |
70 Sq. m |
|
6. |
Process Dynamics & Control |
01 |
70 Sq. m |
|
7. |
Process Modeling and Simulation Laboratory |
01 |
70 Sq. m |
|
8. |
Departmental Library |
01 |
45 Sq. m |
|
9. |
Seminar Hall |
01 |
175 Sq. m |
|
10 |
Drawing Hall |
01 |
70 Sq. m |
|
11 |
Project Lab |
01 |
105 Sq. m |
|
12 |
HOD Room |
01 |
45 Sq. m |
|
13 |
Faculty Room / AP Room |
01 |
45 Sq. m |
|
14 |
Staff Room |
01 |
32 Sq. m |
|
15 |
Store Room |
01 |
25 Sq. m |
|
16 |
Electrical Control Room |
01 |
25 Sq. m |
- List of Special Purpose Equipments
|
Sr. No. |
Name Of Equipment |
Qty |
|
1 |
Data Projector (LCD) |
05 |
|
2 |
Overhead Projectors |
02 |
Computer Details
|
Sr. No. |
Name Of Equipment |
Qty |
|
1 |
Computers |
55 |
|
2 |
Printers (Dot Matrix, Laser printers, all in one ) |
08 |
|
3 |
Scanners |
02 |
|
4 |
Lease Line (45 MBPS) |
155 Mbps Shared |
- Departmental Library details
|
Sr. No. |
Name |
No. |
|
1 |
References |
217 |
|
2 |
Text Books (Titles) |
17 |
|
3 |
Other Books (Donated) |
102 |
|
4 |
Magazine : 01 (Back dated volume: 5) |
25 |
|
5 |
Journal: 11 (Back dated Volume : 584) |
117 |
|
6 |
Cds |
61 Cds |
Details of faculty rooms available:
|
Sr. No. |
Room Name |
Room No./ Room Code |
Room Area in Sq. m. |
|
01 |
Faculty Room |
B207 |
40.00 |
|
02 |
Faculty Room |
B209 |
7.50 |
|
03 |
Faculty Room (HOD Cabin) |
B107 |
40.00 |
|
04 |
Faculty Room |
B210 |
35.00 |
|
Total area |
122.50 |
||
Additional separate faculty cabins are available:
|
Sr. No. |
Room Name |
Room No./ cabin Code |
Room Area in Sq. m. |
|
01 |
Faculty Cabin |
B108-II |
7.50 |
|
02 |
Faculty Cabin |
B106-I |
7.50 |
|
03 |
Faculty Cabin |
B206-I |
7.50 |
|
04 |
Faculty Cabin |
B103-II |
08.00 |
|
Total area |
30.50 |
||
Area required as per AICTE norms for 11 faculty = 11 x 5 = 55 Sq. m.
Area required as per AICTE norms for HOD Cabin = 20 Sq. m.
|
Particulars |
Area required in sq. m. as per AICTE norms for 11 faculty |
Area available in Sq. m. |
|
HOD Cabin |
20 |
40 |
|
Faculty Rooms / cabins |
55 |
113 |
|
Total area in Sq. m. |
75 |
153 |